    • Bottle storage, bottling hall and outdoor area (D-799, D-804)
    • Fibrofor HIGH GRADE 19 mm
    • 2.300 m² (inside) + 500 m² (outside)
    • Bavaria (D-82)
    • Concrete core activation
  • In this construction project, the statically chargeable plastic microfibre HIGH GRADE 19 was installed with few joints, with fields of 36 x 24 m each and additional reinforcement. XPS insulation was used at the edges. The outer surface was executed with cut joints and a required crack width of 0.2 mm.

    Advantages:

    • Reinforcement construction is not necessary or is reduced (cost and time savings)
    • Structural design according to Eurocode 2
    • All types of surface treatments possible
    • Surfaces with few joints up to 1.000 m²
    • No corrosion
    • Resistant to salt water and aggressive liquids